Opening hooks for contractors

Film the walkthrough, the allowance, and the schedule. Do not invent a project price. Say one line, then show the work. A hook is not a view count.

These lines are for a general contractor talking to homeowners who want to know what happens before a hammer comes out. Grouped as curiosity, mistake, myth, story, and how-to. Film them in a job site you are allowed to film, or a sample set of plans on a table.

Curiosity

  1. The allowance is the money for a choice you have not made.
  2. This dimension on the plan is the one I verify before I order.
  3. The schedule moved because a selection date moved.
  4. Demo protection is the unpretty part. It is the job.
  5. A change order is how the work stays honest.
  6. The punch list is how done gets defined.

Mistake

  1. Do not invent a project price. Show the allowance line and say the price waits until selections are in.
  2. Stop posting a timelapse with no words. Say what the viewer is looking at while the work is in frame.
  3. A client's house needs permission before it is content.
  4. Do not guess what is inside a wall on camera.
  5. Hiding an allowance is how budgets explode.
  6. Do not film unsafe work for a better angle.

Myth

  1. Fast is not the same as sequenced. Name the inspection that has to happen before the next trade.
  2. You do not need a mansion reveal. Walk one real detail on a job you are allowed to film.
  3. The lowest bid is not a scope. Read the included line and the excluded line.
  4. Inspections are not all yours to pass on your timing.
  5. Living in the house during the work is a plan, not a surprise.
  6. A verbal yes is how disputes start. I ask for the decision in writing.

Story

  1. A homeowner circled a fixture the allowance could not buy. I showed both.
  2. The dumpster date slipped and the schedule told the truth.
  3. I found something in the wall that was not on the plan. I filmed the update, not a scare cost.
  4. A sub's work failed a line on my list. I showed the list.
  5. The family needed a path through the house. That was the meeting.
  6. The final walk was a punch list, not a ribbon.

How-to

  1. Point at one dimension you verify. Put your tape on the plan and say the number you needed.
  2. Explain an allowance with the line in frame.
  3. Show a blank change order. Show the blank form and the line the owner has to sign.
  4. Read a selection deadline and what happens if it slips.
  5. Film the daily photo you take for the file.
  6. Name the three documents you want before the walkthrough.

Use a hook, then film one of the 30 contractors video ideas.

Join the 30-day posting challenge

Pay $99 to reserve your December spot. Day 1 is December 1 for everyone. Connect Instagram, YouTube, or TikTok before December 1. Your 30 days run December 1 to 30.

Reserve my spot for $99

Not ready to pay $99?

Get the free playbook. It is the free guide already on this site. It does not start the challenge.

Reserve my spot for $99
30 Short-Video Hooks for Contractors | Daily Post Challenge