Contractors · hooks
Opening hooks for contractors
Film the walkthrough, the allowance, and the schedule. Do not invent a project price. Say one line, then show the work. A hook is not a view count.
These lines are for a general contractor talking to homeowners who want to know what happens before a hammer comes out. Grouped as curiosity, mistake, myth, story, and how-to. Film them in a job site you are allowed to film, or a sample set of plans on a table.
Curiosity
- The allowance is the money for a choice you have not made.
- This dimension on the plan is the one I verify before I order.
- The schedule moved because a selection date moved.
- Demo protection is the unpretty part. It is the job.
- A change order is how the work stays honest.
- The punch list is how done gets defined.
Mistake
- Do not invent a project price. Show the allowance line and say the price waits until selections are in.
- Stop posting a timelapse with no words. Say what the viewer is looking at while the work is in frame.
- A client's house needs permission before it is content.
- Do not guess what is inside a wall on camera.
- Hiding an allowance is how budgets explode.
- Do not film unsafe work for a better angle.
Myth
- Fast is not the same as sequenced. Name the inspection that has to happen before the next trade.
- You do not need a mansion reveal. Walk one real detail on a job you are allowed to film.
- The lowest bid is not a scope. Read the included line and the excluded line.
- Inspections are not all yours to pass on your timing.
- Living in the house during the work is a plan, not a surprise.
- A verbal yes is how disputes start. I ask for the decision in writing.
Story
- A homeowner circled a fixture the allowance could not buy. I showed both.
- The dumpster date slipped and the schedule told the truth.
- I found something in the wall that was not on the plan. I filmed the update, not a scare cost.
- A sub's work failed a line on my list. I showed the list.
- The family needed a path through the house. That was the meeting.
- The final walk was a punch list, not a ribbon.
How-to
- Point at one dimension you verify. Put your tape on the plan and say the number you needed.
- Explain an allowance with the line in frame.
- Show a blank change order. Show the blank form and the line the owner has to sign.
- Read a selection deadline and what happens if it slips.
- Film the daily photo you take for the file.
- Name the three documents you want before the walkthrough.
Use a hook, then film one of the 30 contractors video ideas.
Join the 30-day posting challenge
Pay $99 to reserve your December spot. Day 1 is December 1 for everyone. Connect Instagram, YouTube, or TikTok before December 1. Your 30 days run December 1 to 30.
Reserve my spot for $99Not ready to pay $99?
Get the free playbook. It is the free guide already on this site. It does not start the challenge.