Printable calendar

30-day posting calendar for contractors

Film the walkthrough, the allowance, and the schedule. Do not invent a project price. Film one line a day from a job site you are allowed to film, or a sample set of plans on a table. This page is the calendar. Nothing is behind a form.

Thirty videos for homeowners who want to know what happens before a hammer comes out. Static posts do not count.

  1. Day 1

    Show a plan page and point at the dimension you verify before you order.

  2. Day 2

    Film an allowance line and say what is not chosen yet.

  3. Day 3

    Explain a change order with a blank form. Show the blank line the owner has to sign, on a job you may film.

  4. Day 4

    Show the protection you put on a floor before demo.

  5. Day 5

    Film a selection deadline on the calendar and what happens if it slips.

  6. Day 6

    Explain inspections you schedule and the one you do not control.

  7. Day 7

    Show a dumpster or a debris pile and the day it has to be gone.

  8. Day 8

    Film the question you ask about how the family will live in the house during the work.

  9. Day 9

    Explain a bid versus a contract in one minute, holding both.

  10. Day 10

    Show a subcontractor's work you are checking, with permission, and the item on your list.

  11. Day 11

    Film a punch list and the way you mark done. Mark one item done and leave the client's name off the page.

  12. Day 12

    Explain dust, noise, and the hours you actually work.

  13. Day 13

    Show a material that is back-ordered and the choice you need from the owner.

  14. Day 14

    Film the site meeting agenda. Read the three lines, on a job you are allowed to film.

  15. Day 15

    Explain what you will not guess on camera about someone else's structural wall.

  16. Day 16

    Show the lockbox or the key process. Show how the key moves, and keep the code out of frame.

  17. Day 17

    Film a photo you take for the file every day you are on site.

  18. Day 18

    Explain warranties you give, in one sentence, if you give one. If you do not, say so.

  19. Day 19

    Show the difference between a fixture allowance and the fixture they circled.

  20. Day 20

    Film the daily cleanup standard. Show the standard at the end of the day on a site you may film.

  21. Day 21

    Explain a draw schedule tied to a milestone. Name the milestone and the draw that waits on it.

  22. Day 22

    Show a sample board and the item that is still open.

  23. Day 23

    Film the neighbor note or the parking plan if the job needs one.

  24. Day 24

    Explain why you ask for a decision in writing. Read the sentence you ask them to write back.

  25. Day 25

    Show a tool the crew is using and the reason that step cannot be skipped for a video.

  26. Day 26

    Film the end of demo and what you found that was not on the plan. No scare story with a fake cost.

  27. Day 27

    Explain a design-build handoff if that is your model, or say you build from someone else's drawings.

  28. Day 28

    Show the safety item you require on your site. Name the item and why the crew does not skip it.

  29. Day 29

    Film the homeowner update you send, with the address covered.

  30. Day 30

    Close with the three documents you want before the first walkthrough.

Join the 30-day posting challenge

Pay $99 to reserve your December spot. Day 1 is December 1 for everyone. Connect Instagram, YouTube, or TikTok before December 1. Your 30 days run December 1 to 30.

Reserve my spot for $99

Not ready to pay $99?

Get the free playbook. It is the free guide already on this site. It does not start the challenge.

Reserve my spot for $99
Free 30-Day Posting Calendar for Contractors | Daily Post Challenge